Time-To-Build
Interrelated Investment and Labour Demand Modelling With Applications to Six OECD Countries
Häftad, Engelska, 1995
709 kr
Beställningsvara. Skickas inom 10-15 vardagar
Fri frakt för medlemmar vid köp för minst 249 kr.As large physical capital stock projects need long periods to be built, a time-to-build specification is incorporated in factor demand models. Time-to-build and adjustment costs dynamics are identified since by the first moving average dynamics, whereas by the latter autoregressive dynamics are induced. Empirical evidence for time-to-build is obtained from data from the Dutch construction industry and by the estimation result from the manufacturing industry of six OECD countries.
Produktinformation
- Utgivningsdatum1995-02-17
- Mått155 x 235 x 13 mm
- Vikt341 g
- FormatHäftad
- SpråkEngelska
- SerieLecture Notes in Economics and Mathematical Systems
- Antal sidor204
- FörlagSpringer-Verlag Berlin and Heidelberg GmbH & Co. KG
- ISBN9783540588092