The International Space Station (ISS) is truly an international undertaking. The project is being led by the United States, with the participation of Japan, the European Space Agency, Canada, Italy, Russia, and Brazil. Russia is participating in full partnership with the United States in the fabrication of ISS modules, the assembly of ISS elements on orbit, and, after assembly has been completed, the day-to-day operation of the station. Construction of the ISS began with the launch of the Russian Zarya module in November 1998 followed by the launch of the U.S. Unity module in December 1998. The two modules were mated and interconnected by the crew of the Space Shuttle during the December flight, and the first assembled element of the ISS was in place. Construction will continue with the delivery of components and assembly on orbit through a series of 46 planned flights. During the study period, the Assembly Complete milestone was scheduled for November 2004 with the final ISS construction flight delivering the U.S. Habitation Module.Engineering Challenges to the Long-Term Operation of the International Space Station is a study of the engineering challenges posed by longterm operation of the ISS. This report states that the National Aeronautics and Space Administration (NASA) and the ISS developers have focused almost totally on completing the design and development of the station and completing its assembly in orbit. This report addresses the issues and opportunities related to long-term operations.
Committee on the Engineering Challenges to the Long-Term Operation of the International Space Station, Aeronautics and Space Engineering Board, National Research Council
1 Front Matter; 2 Executive Summary; 3 1 Introduction; 4 2 International Launch Vehicle Fleet; 5 3 Operations, Maintenance, and Reliability; 6 4 Extravehicular Activity, Robotics, and Supporting Technologies; 7 5 Equipment Upgrades, Software, and Communications; 8 6 End-of-Life Disposal; 9 Appendix A: Statement of Task; 10 Appendix B: Biographical Sketches of Committee Members; 11 Appendix C: Phase 1 Mir Program; 12 Acronyms and Abbreviations; 13 Color Plates
National Research Council, Division on Earth and Life Studies, Board on Life Sciences, Committee on Metagenomics: Challenges and Functional Applications
National Research Council, Division of Behavioral and Social Sciences and Education, Institute of Medicine, and Families Board on Children, Youth, Steve Olson
National Research Council, Division on Earth and Life Studies, Board on Agriculture and Natural Resources, Committee on Animal Nutrition, Subcommittee on Dog and Cat Nutrition
National Research Council, Division of Behavioral and Social Sciences and Education, Commission on Behavioral and Social Sciences and Education, and Statistical Sciences Committee on AIDS Research and the Behavioral, Social, Lincoln E. Moses, Heather G. Miller, Charles F. Turner
National Research Council, Division on Engineering and Physical Sciences, and Applications Commission on Physical Sciences, Mathematics, Committee to Provide Interim Oversight of the DOE Nuclear Weapons Complex
National Research Council, Division on Engineering and Physical Sciences, Commission on Engineering and Technical Systems, Division of Natural Hazard Mitigation, Committee on Natural Disasters
National Research Council, Division on Earth and Life Studies, Environment and Resources Commission on Geosciences, Board on Environmental Studies and Toxicology, Committee to Review the Outer Continental Shelf Environmental Studies Program, Ecology Panel