bokomslag Pre-Feasibility Study of Upper Balephi Khola Hydroelectric Project
Vetenskap & teknik

Pre-Feasibility Study of Upper Balephi Khola Hydroelectric Project

Ojaswee Shiwakoti Jyoti Tamang Prabesh Sharma

Pocket

1259:-

Funktionen begränsas av dina webbläsarinställningar (t.ex. privat läge).

Uppskattad leveranstid 7-11 arbetsdagar

Fri frakt för medlemmar vid köp för minst 249:-

  • 176 sidor
  • 2012
This Project report entitled Pre-Feasibility Study of Upper Balephi Khola Hydroelectric Project,Sindhupalchowk. We the students of 4th year of Civil Engineering of Kantipur Engineering college jointly completed the project on 4 months of time period. We visited the site studied the background, area, location, access, catchment areas ,transmission route, hydrology, geology for project. Then desk study, Map study, Design of the various structures were done. Design discharge at 50th percentage of time was 21.84,net head 47.5 m available power 89.10 Mw, available energy 60.60 Gwh were calculated. Then the financial analysis of the project was done which gave the total cost of project of 99 crores,80 lakhs only(lump sum rounded figure),thus the cost per Mw generation was 12 crores, ninty lakhs only and simple pay back period nearly equal to 5 yrs, benefit cost ratio 1.52>1 .Hence selling price of our energy per unit @Rs.3.50 seems feasible. Thus, from our calculations and computation we are able to say that our project is feasible and any one willing can take the project,since this project is promoted so that loadshedding problem of Nepal can be minimized to some extent.
  • Författare: Ojaswee Shiwakoti, Jyoti Tamang Prabesh Sharma
  • Format: Pocket/Paperback
  • ISBN: 9783659187735
  • Språk: Engelska
  • Antal sidor: 176
  • Utgivningsdatum: 2012-07-23
  • Förlag: LAP Lambert Academic Publishing